444 5 194
Login Sign Up

🏗️ Bahrain Ministry of Public Works – Tubli WPCC Tertiary Treatment Plant Phase-1 COD Blower Installation and Material Supply (MOW-2025-333)

Bahrain's Tubli Water Pollution Control Center (TWPCC) is planned to produce 200,000 m³ of treated wastewater (TSE) per day. This tender covers the installation services, spare parts, and various materials for the Stage-1 COD (Catalyst Ozone Destructor) system. The aim is to reduce environmental impacts by converting unreacted ozone to O₂ via a cat...

1462
Bahrain
Tender
5 Credits
197 Views

Join Us

Here is the information of this export company that wants to import from Turkey. .

Please log in to view the post details and attachments .