π Jordan Calls for Infrastructure Investment β International Procurement Request for 3 Separate Infrastructure Projects
These official invitations to tender from the Kingdom of Jordan call for materials and services for three strategic projects addressing water infrastructure, agricultural production, and electricity infrastructure. The projects cover critical areas such as rural development, climate resilience, improving electricity grids, and sustainable agricultural production. Project: Agricultural Irrigation System and Afforestation Infrastructure
Project Name: Establishment of Irrigation Networks and Agriculture Area Infrastructure
Scope:
Construction of water tanks (1,200 mΒ³ capacity)
Irrigation system installation
Infrastructure components for agricultural production
Electrification system installation
Location: Ajloun, Irbid, Jerash, and other northern regions
Duration: 210 days
Proposal Deadline: September 30, 2025
Required Documents:
Business registration
Financial qualification documents
Similar work experience
Detailed technical proposal
30,000 Jordanian Dinar provisional guarantee
β‘ Project 2: Strengthening the Electricity Distribution Infrastructure
Project Name: Supply of Electrical Distribution Materials for Rural Areas
Scope:
Procurement of materials for medium and low voltage power lines
Poles, transformers, transmission cables, and connection equipment
Rural electricity networks Modernization
Location: All rural areas
Duration: 150 days
Bid Deadline: September 15, 2025
Required Documents:
IEC/internationally certified products
Minimum 3 similar project references
Manufacturer's warranty and technical catalogs
20,000 Jordanian Dinar provisional guarantee
π§± Project 3: Agricultural Block Construction and Material Distribution
Project Name: Supply and Distribution of Agricultural Construction Materials
Scope:
Animal feed blocks (manual)
Construction materials for security structures
Agricultural backpack sprayers
Material logistics and on-site delivery
Location: Nationwide β distribution to rural areas
Duration: 120 days
Bid Deadline: September 10, 2025
Note: The contractor is responsible for all distribution and logistics.